Commercial Construction

Early Start Permits
The following items are required to obtain Early Start Permits:
  • Permit Application form completed
  • Evidence that any and all preconstruction conditions are complied with (i.e. Zoning, DNR, Commerce, etc.)
  • Footing and Foundation plan with all necessary approvals
Full Permit
The following items are required to obtain a Full Permit:
  • Early Start Permit items
  • Building Plans
  • Sanitary Plumbing Plans
  • Storm Water Plumbing Plans
  • HVAC Plans
  • Lighting Plans
  • Automatic Sprinkler / Standpipe Plans
  • Fire and Smoke Alarm System Plans
Commercial Remodeling
The following items are required to obtain a permit for commercial remodeling:
  • Building plan showing the following:
    • Floor plan of all levels being worked on (If the project is a remodel of an existing finished space, a before and after drawing are each required)
    • All rooms labeled
    • If sleeping spaces are involved, all windows and doors shall be labeled with manufacturer's name or natural light and ventilation areas in square feet
    • Any supporting structural calculations if structural elements are involved
    • If state approval is required, a copy of the state approved plans and supplemental documents (The City of Verona is authorized by the Wisconsin Department of Commerce to perform certain plan reviews. Please see the Commercial Plan Review page for additional information)
Inspections
Please visit our inspections page for a comprehensive list of all inspections performed by the Building Department.

Contact Us

  1. Larry Turner


    Building Inspector
    Ph: 608-845-0963
    Email

    Mike Jacek


    Assistant Building Inspector
    Email
    Ph: 608-845-0903

    City Hall
    111 Lincoln St.
    Verona, WI 53593
    Directions

    Ph: 608-845-6495
    Fx: 608-845-8613

    Hours


    Monday - Friday
    8 a.m. - 4:30 p.m.
    or by appointment

    Staff Directory